Railway

PERFORMANCE PARAMETERS

ITEMDESCRIPTION
Gauge1,067 mm
Axie Load26 tonnes
Number of principle linesSingle way with 22 crossings
SignalingAutomatic with centralized control
Top pending0.5% for loaded trains, 1.0% for empty trains
Composition of the train2 locomotives with 140 wagons of 104 gross tonnes
Trains in operation14 trains per day
Cycle duration30 hours
Capacity of the train11,200 tonnes net
Fleet30 locomotives and 2,100 wagons
Passenger train2 per day
EN
PT EN